Project evaluation criteria and cost-benefit analysis / (Record no. 1329)

MARC details
000 -LEADER
fixed length control field 00833nam a2200193 a 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 090615s1989 ii a b 001 0 eng d
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 338.9
Edition number 20
999 ## - SYSTEM CONTROL NUMBERS (KOHA)
Koha biblionumber 1329
245 00 - TITLE STATEMENT
Title Project evaluation criteria and cost-benefit analysis /
Statement of responsibility, etc K. Puttaswamaiah, edited.
250 ## - EDITION STATEMENT
Edition statement 2nd ed.
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc New Delhi :
Name of publisher, distributor, etc Oxford & IBH,
Date of publication, distribution, etc c1989.
300 ## - PHYSICAL DESCRIPTION
Extent xviii, 196 p. :
Other physical details ill. ;
Dimensions 23 cm.
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc Includes bibliographical references and index.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Economic development projects
General subdivision Evaluation.
Topical term or geographic name as entry element Economic development projects
General subdivision Cost effectiveness.
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Puttaswamaiah, K.
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Cost, normal purchase price Total Checkouts Total Renewals Full call number Barcode Date last seen Date checked out Copy number Price effective from Koha item type
    Dewey Decimal Classification     Ayesha Abed Library Ayesha Abed Library General Stacks 25/06/2009 112.00 1 8 338.9 PRO 3010005479 10/09/2012 08/07/2012 1 25/06/2009 Book