Transitional linkage: redesigning airport railway station with integrated MRT and BRT station

This thesis is submitted in partial fulfillment of the requirements for the degree of Bachelor of Architecture, 2017.

Bibliographische Detailangaben
1. Verfasser: Rahman, Mohammad Zillur
Weitere Verfasser: Department of Architecture, BRAC University
Format: Abschlussarbeit
Sprache:English
Veröffentlicht: BRAC Univeristy 2018
Schlagworte:
Online Zugang:http://hdl.handle.net/10361/10392

Ähnliche Einträge