Initial social impact of the Rupsha bridge project in Khulna
Fallowing a decision by the government to construct a bridge over the river Rupsha in Khulna, a number of preparatory studies were undertaken on different aspects of the bridge project. An initial social impact assessment was a part of these studies. Two alternative sites have been considered for...
| 主要な著者: | , |
|---|---|
| フォーマット: | Research report |
| 言語: | English |
| 出版事項: |
BRAC Research and Evaluation Division (RED)
2019
|
| 主題: | |
| オンライン・アクセス: | http://hdl.handle.net/10361/13356 |