Missing of punches for MEP works in the concrete members (slab, beam & walls)
This record consists of general correspondence regarding the missing punches for MEP works and order to postpone the concreting program for selected areas of BRACU new campus project.
| Autor principal: | Brac University |
|---|---|
| Formato: | General correspondence |
| Lenguaje: | English |
| Publicado: |
Brac University
2023
|
| Materias: | |
| Acceso en línea: | http://hdl.handle.net/10361/19644 |
Ejemplares similares
-
Purchase order for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom for BracU new campus project
por: Brac University
Publicado: (2023) -
Instruction to appoint experienced architect and MEP engineer to supervise the finishing works and MEP works
por: Brac University
Publicado: (2023) -
Wall & floor punch location & dimension layout for basement plan
por: Electro-Mechanical Control Services (EMCS)
Publicado: (2023) -
VO#32 Valuation of embedded parts and junction box for MEP works
por: Brac University
Publicado: (2023) -
Delayed submitting of check list for concreting work
por: Brac University
Publicado: (2023)