Time extension of design change for 6th-8th floor of BRAC University new campus project
This record consists of general correspondence regarding time extension of design change for 6th-8th floor of BRAC University new campus project.
| Main Author: | Brac University |
|---|---|
| Format: | General correspondence |
| Language: | English |
| Published: |
Brac University
2023
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/10361/19727 |
Similar Items
-
Time extension of design change for 6th-8th floor
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Time extension of design change for 6th-8th floor
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Request for time extension
by: Adex Corporation Ltd.
Published: (2023) -
Extension of time to submit quotation for carryout the works under variations or extra works
by: Brac University
Published: (2023) -
Request for time extension due to flush valve issue
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023)