Confirmation to manufacture north zone escalator from B1 to Level 10
This record consists of general correspondence regarding the confirmation to manufacture north zone escalator from B1 to Level 10 of BRACU new campus building.
| المؤلف الرئيسي: | Brac University |
|---|---|
| التنسيق: | General correspondence |
| اللغة: | English |
| منشور في: |
Brac University
2023
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19757 |
مواد مشابهة
-
Confirmation to start manufacturing of north zone escalator from level 10 to roof (01 pair)
بواسطة: Brac University
منشور في: (2023) -
Regarding the deviation in the groove making & pit width at north zone escalator
بواسطة: Brac University
منشور في: (2023) -
Escalators (Architectural Consultant Drawings)
بواسطة: WOHA Designs PTE LTD
منشور في: (2023) -
Earlier completion of zone A and zone B of BRAC University new campus complex
بواسطة: Brac University
منشور في: (2023) -
Supply of lift and escalator
بواسطة: Brac University
منشور في: (2023)