Submitting post level survey of the completed structure
This record consists of general correspondence regarding submitting post level survey of the completed structure of BRAC University new campus project.
| প্রধান লেখক: | Brac University |
|---|---|
| বিন্যাস: | General correspondence |
| ভাষা: | English |
| প্রকাশিত: |
Brac University
2023
|
| বিষয়গুলি: | |
| অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/19832 |
অনুরূপ উপাদানগুলি
-
Regarding post level survey of the building or at least near the escalator opening area in all the floors
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors
অনুযায়ী: BUCG-ABC Joint Venture (BUCG-ABC JV)
প্রকাশিত: (2023) -
Reminder letter for submitting complete M&E design to WOHA & Transsolar
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Request postponement to submit breakdown for extra works
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Submitting final design, drawing, specification and BOQ for the BBT
অনুযায়ী: Brac University
প্রকাশিত: (2023)