Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
| Autor principal: | Brac University |
|---|---|
| Format: | General correspondence |
| Idioma: | English |
| Publicat: |
Brac University
2023
|
| Matèries: | |
| Accés en línia: | http://hdl.handle.net/10361/19907 |
Ítems similars
-
Regarding inspection report of fire pump at BRACU NCP
per: Bengal Technological Corporation Ltd.(BTCL)
Publicat: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
per: Brac University
Publicat: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
per: Brac University
Publicat: (2023) -
Regarding fire incidents and further precaution
per: Brac University
Publicat: (2023) -
Regarding fire incidents and further precaution
per: Brac University
Publicat: (2023)