Instruction to complete the tiling work in the floors 6 to 12 and the toilets
This record consists of general correspondence regarding the instruction to complete the tiling work in the floors 6 to 12 and the toilets of BRACU new campus building.
| Huvudupphovsman: | |
|---|---|
| Materialtyp: | General correspondence |
| Språk: | English |
| Publicerad: |
Brac University
2023
|
| Ämnen: | |
| Länkar: | http://hdl.handle.net/10361/19930 |
| id |
10361-19930 |
|---|---|
| record_format |
dspace |
| spelling |
10361-199302023-08-27T21:02:53Z Instruction to complete the tiling work in the floors 6 to 12 and the toilets Brac University New campus project General correspondence Tiling works This record consists of general correspondence regarding the instruction to complete the tiling work in the floors 6 to 12 and the toilets of BRACU new campus building. 2023-08-27T07:16:45Z 2023-08-27T07:16:45Z ©2022 2022-10-23 General correspondence No.: BRACU-NCP/2022/111A http://hdl.handle.net/10361/19930 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 1 page application/pdf Brac University |
| institution |
Brac University |
| collection |
Institutional Repository |
| language |
English |
| topic |
New campus project General correspondence Tiling works |
| spellingShingle |
New campus project General correspondence Tiling works Brac University Instruction to complete the tiling work in the floors 6 to 12 and the toilets |
| description |
This record consists of general correspondence regarding the instruction to complete the tiling work in the floors 6 to 12 and the toilets of BRACU new campus building. |
| format |
General correspondence |
| author |
Brac University |
| author_facet |
Brac University |
| author_sort |
Brac University |
| title |
Instruction to complete the tiling work in the floors 6 to 12 and the toilets |
| title_short |
Instruction to complete the tiling work in the floors 6 to 12 and the toilets |
| title_full |
Instruction to complete the tiling work in the floors 6 to 12 and the toilets |
| title_fullStr |
Instruction to complete the tiling work in the floors 6 to 12 and the toilets |
| title_full_unstemmed |
Instruction to complete the tiling work in the floors 6 to 12 and the toilets |
| title_sort |
instruction to complete the tiling work in the floors 6 to 12 and the toilets |
| publisher |
Brac University |
| publishDate |
2023 |
| url |
http://hdl.handle.net/10361/19930 |
| work_keys_str_mv |
AT bracuniversity instructiontocompletethetilingworkinthefloors6to12andthetoilets |
| _version_ |
1814308334172372992 |