Issuing NCR (Non-conformance report) for BRACU new campus project
This record consists of general correspondence regarding the structural steel works from 6th to 12th floor of BRACU new campus project site
| Hovedforfatter: | Brac University |
|---|---|
| Format: | Other |
| Sprog: | English |
| Udgivet: |
Brac University
2023
|
| Fag: | |
| Online adgang: | http://hdl.handle.net/10361/20094 |
Lignende værker
-
Request to open new work order for the steel structure work of BRAC University new campus project
af: BUCG-ABC Joint Venture
Udgivet: (2023) -
Regarding confirming remaining steel structure materials of BRAC University new campus project
af: Brac University
Udgivet: (2023) -
The engineer’s instruction to complete steel structure works
af: Brac University
Udgivet: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Regarding transporting the steel structure of zone C outside of BRAC University new campus project
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)