Re: All the M&E design immediately to be reviewed by the Transsolar
This record consists of general correspondence regarding the reply on completing all the M&E design immediately to be reviewed by the Transsolar for BRACU new campus project.
| Main Author: | |
|---|---|
| Format: | General correspondence |
| Language: | English |
| Published: |
Brac University
2023
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/10361/20223 |
| id |
10361-20223 |
|---|---|
| record_format |
dspace |
| spelling |
10361-202232023-08-30T21:02:37Z Re: All the M&E design immediately to be reviewed by the Transsolar BUCG-ABC Joint Venture (BUCG-ABC JV) New campus project General correspondence Transsolar M&E design This record consists of general correspondence regarding the reply on completing all the M&E design immediately to be reviewed by the Transsolar for BRACU new campus project. 2023-08-30T07:01:22Z 2023-08-30T07:01:22Z ©2020 2020-06-12 General correspondence Ref.: BUCG-ABC JV/BRACU/084/20 http://hdl.handle.net/10361/20223 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 1 page application/pdf Brac University |
| institution |
Brac University |
| collection |
Institutional Repository |
| language |
English |
| topic |
New campus project General correspondence Transsolar M&E design |
| spellingShingle |
New campus project General correspondence Transsolar M&E design BUCG-ABC Joint Venture (BUCG-ABC JV) Re: All the M&E design immediately to be reviewed by the Transsolar |
| description |
This record consists of general correspondence regarding the reply on completing all the M&E design immediately to be reviewed by the Transsolar for BRACU new campus project. |
| format |
General correspondence |
| author |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| author_facet |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| author_sort |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| title |
Re: All the M&E design immediately to be reviewed by the Transsolar |
| title_short |
Re: All the M&E design immediately to be reviewed by the Transsolar |
| title_full |
Re: All the M&E design immediately to be reviewed by the Transsolar |
| title_fullStr |
Re: All the M&E design immediately to be reviewed by the Transsolar |
| title_full_unstemmed |
Re: All the M&E design immediately to be reviewed by the Transsolar |
| title_sort |
re: all the m&e design immediately to be reviewed by the transsolar |
| publisher |
Brac University |
| publishDate |
2023 |
| url |
http://hdl.handle.net/10361/20223 |
| work_keys_str_mv |
AT bucgabcjointventurebucgabcjv reallthemedesignimmediatelytobereviewedbythetranssolar |
| _version_ |
1814306842294091776 |