Regarding acceptance of steel structure
This record consists of general correspondence regarding the acceptance of steel structure from 11th to 15th batches for BRACU new campus project.
| Hovedforfatter: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Format: | General correspondence |
| Sprog: | English |
| Udgivet: |
Brac University
2023
|
| Fag: | |
| Online adgang: | http://hdl.handle.net/10361/20276 |
Lignende værker
-
Regarding confirming remaining 3468.302t steel structure elements list
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Regarding transporting the steel structure of zone C outside of BRAC University new campus project
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Proposal resubmission of VO#010 for steel structure works
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Reply to shipment of pre-fabricated steel structure against LC no. 0000021619010057
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Quantity details of the first and second batch of prefabricated steel structure of BRAC University new campus project
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)