Construction schedule for brick wall mock-up of BRAC University new campus project
This record consists of general correspondence regarding construction schedule for brick wall mock-up of BRAC University new campus project.
| 1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Format: | General correspondence |
| Język: | English |
| Wydane: |
Brac University
2023
|
| Hasła przedmiotowe: | |
| Dostęp online: | http://hdl.handle.net/10361/20345 |
Podobne zapisy
-
Regarding replies to mock-up panel of different type brick walls
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Preparation of mock-up for different type brick wall and circular column of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Mock-up panel of different type brick walls of BRAC University new campus project
od: Brac University
Wydane: (2023) -
Prepare mock-up for different type of brick wall and circular column
od: Brac University
Wydane: (2023) -
Reminder to prepare mock-up for different type brick wall and circular column
od: Brac University
Wydane: (2023)