Re: Outstanding design conditions as of 27 April, 2020
This record consists of general correspondence regarding the submission of conceptual design of swimming pool of BRACU new campus project.
| मुख्य लेखक: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| स्वरूप: | General correspondence |
| भाषा: | English |
| प्रकाशित: |
Brac University
2023
|
| विषय: | |
| ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20386 |
समान संसाधन
-
Outstanding design conditions as of 27 April, 2020
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Comment from WOHA on conceptual drawing of swimming pool of BRAC University new campus project
द्वारा: Brac University
प्रकाशित: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
द्वारा: BUCG
प्रकाशित: (2023) -
Roof irrigation system drawing for playground & swimming pool
द्वारा: Electro-Mechanical Control Services (EMCS)
प्रकाशित: (2023) -
Request of closing the outstanding issues of design services of BUCG
द्वारा: BUCG
प्रकाशित: (2023)