VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
This record consists of general correspondence regarding VO #022 extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project.
| Yazar: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Materyal Türü: | General correspondence |
| Dil: | English |
| Baskı/Yayın Bilgisi: |
Brac University
2023
|
| Konular: | |
| Online Erişim: | http://hdl.handle.net/10361/20404 |
Benzer Materyaller
-
Approval of unit rates of non-schedule item UPVC pipe changed from PVC pipe for conduit works
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
VO.22 – Approval of unit rates of non-schedule item' UPVC pipe changed from PVC pipe for conduit works’
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Piping material for conduiting work in audio visual, PA, IT and security access
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Deep tube Well & WASA piping layout drawing
Yazar:: Electro-Mechanical Control Services (EMCS)
Baskı/Yayın Bilgisi: (2023)