Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B
This record consists of general correspondence regarding the response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B of BRACU new campus development project.
| 第一著者: | |
|---|---|
| フォーマット: | General correspondence |
| 言語: | English |
| 出版事項: |
Brac University
2023
|
| 主題: | |
| オンライン・アクセス: | http://hdl.handle.net/10361/20408 |
| id |
10361-20408 |
|---|---|
| record_format |
dspace |
| spelling |
10361-204082023-10-08T10:19:08Z Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B BUCG-ABC Joint Venture (BUCG-ABC JV) New campus project General correspondence BUCG Additional work Pile work Zone B This record consists of general correspondence regarding the response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B of BRACU new campus development project. 2023-09-03T07:25:52Z 2023-09-03T07:25:52Z ©2018 2018-06-19 General correspondence Ref: BUCG-ABC JV/BRACU/30/18 http://hdl.handle.net/10361/20408 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 6 pages application/pdf Brac University |
| institution |
Brac University |
| collection |
Institutional Repository |
| language |
English |
| topic |
New campus project General correspondence BUCG Additional work Pile work Zone B |
| spellingShingle |
New campus project General correspondence BUCG Additional work Pile work Zone B BUCG-ABC Joint Venture (BUCG-ABC JV) Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B |
| description |
This record consists of general correspondence regarding the response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B of BRACU new campus development project. |
| format |
General correspondence |
| author |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| author_facet |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| author_sort |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| title |
Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B |
| title_short |
Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B |
| title_full |
Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B |
| title_fullStr |
Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B |
| title_full_unstemmed |
Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B |
| title_sort |
response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone b |
| publisher |
Brac University |
| publishDate |
2023 |
| url |
http://hdl.handle.net/10361/20408 |
| work_keys_str_mv |
AT bucgabcjointventurebucgabcjv responsetotheengineersreplyconcerningevaluationforadditionalworkofsharingpileworkinzoneb |
| _version_ |
1814307147935121408 |