Removing rebar without notice
This record consists of general correspondence regarding removing rebar without notice of Brac University new campus development project .
| Autor Principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Formato: | General correspondence |
| Idioma: | English |
| Publicado: |
Brac University
2023
|
| Subjects: | |
| Acceso en liña: | http://hdl.handle.net/10361/20631 |
Títulos similares
-
Removal of rebar stacked at the west of the engineer office
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Resubmission of cutting hosting rebar of foundation piles
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Rebar welding at permanent caping in D-wall
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Valuation of rebar connection via mechanical coupler
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023)