Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.
| Main Author: | |
|---|---|
| Format: | Variation order |
| Language: | English |
| Published: |
Brac University
2023
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/10361/21102 |
| id |
10361-21102 |
|---|---|
| record_format |
dspace |
| spelling |
10361-211022023-10-08T10:08:16Z Punch through concret slab for the condensate drain pipe for each HAHU of the calss room BUCG-ABC Joint Venture (BUCG-ABC JV) New campus project Variation order BUCG-ABC Class room Concret slab Condensate drain pipe This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project. 2023-09-20T10:11:30Z 2023-09-20T10:11:30Z ©2022 2022-05-17 Variation order http://hdl.handle.net/10361/21102 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 2 pages application/pdf Brac University |
| institution |
Brac University |
| collection |
Institutional Repository |
| language |
English |
| topic |
New campus project Variation order BUCG-ABC Class room Concret slab Condensate drain pipe |
| spellingShingle |
New campus project Variation order BUCG-ABC Class room Concret slab Condensate drain pipe BUCG-ABC Joint Venture (BUCG-ABC JV) Punch through concret slab for the condensate drain pipe for each HAHU of the calss room |
| description |
This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project. |
| format |
Variation order |
| author |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| author_facet |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| author_sort |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
| title |
Punch through concret slab for the condensate drain pipe for each HAHU of the calss room |
| title_short |
Punch through concret slab for the condensate drain pipe for each HAHU of the calss room |
| title_full |
Punch through concret slab for the condensate drain pipe for each HAHU of the calss room |
| title_fullStr |
Punch through concret slab for the condensate drain pipe for each HAHU of the calss room |
| title_full_unstemmed |
Punch through concret slab for the condensate drain pipe for each HAHU of the calss room |
| title_sort |
punch through concret slab for the condensate drain pipe for each hahu of the calss room |
| publisher |
Brac University |
| publishDate |
2023 |
| url |
http://hdl.handle.net/10361/21102 |
| work_keys_str_mv |
AT bucgabcjointventurebucgabcjv punchthroughconcretslabforthecondensatedrainpipeforeachhahuofthecalssroom |
| _version_ |
1814308337448124416 |