Plumbing layout at basement-03
This record contains consultant drawings of plumbing of Brac University New Campus Project. It consists of only DWG version of drawings.
| Hoofdauteur: | Electro-Mechanical Control Services (EMCS) |
|---|---|
| Formaat: | Drawings |
| Taal: | English |
| Gepubliceerd in: |
Brac University
2023
|
| Onderwerpen: | |
| Online toegang: | http://hdl.handle.net/10361/21491 |
Gelijkaardige items
-
Plumbing layout of basement-02
door: Electro-Mechanical Control Services (EMCS)
Gepubliceerd in: (2023) -
Plumbing layout of basement-01
door: Electro-Mechanical Control Services (EMCS)
Gepubliceerd in: (2023) -
Plumbing layout for basement-1 (utility building)
door: Electro-Mechanical Control Services (EMCS)
Gepubliceerd in: (2023) -
Plumbing layout for basement-2 (utility building)
door: Electro-Mechanical Control Services (EMCS)
Gepubliceerd in: (2023) -
Plumbing layout for basement-3 (utility building)
door: Electro-Mechanical Control Services (EMCS)
Gepubliceerd in: (2023)