Cut-off ditch in the south of utility building of BRAC University new campus project
This record contains as-built drawing of RCC (Reinforced Cement Concrete) structure of Brac University New Campus Project. It consists of PDF & DWG version of drawings.
| Yazar: | WEB Structures |
|---|---|
| Materyal Türü: | Drawings |
| Dil: | English |
| Baskı/Yayın Bilgisi: |
Brac University
2023
|
| Konular: | |
| Online Erişim: | http://hdl.handle.net/10361/21641 |
Benzer Materyaller
-
Utility building of BRAC University new campus project
Yazar:: WEB Structures
Baskı/Yayın Bilgisi: (2023) -
South porch of BRAC University new campus project
Yazar:: WEB Structures
Baskı/Yayın Bilgisi: (2023) -
Entrance piles plan of BRAC University new campus project
Yazar:: WEB Structures
Baskı/Yayın Bilgisi: (2023) -
Main entrance of BRAC University new campus project
Yazar:: WEB Structures
Baskı/Yayın Bilgisi: (2023) -
Cable trench of BRAC University new campus project
Yazar:: WEB Structures
Baskı/Yayın Bilgisi: (2023)