Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
This internship report is submitted in partial fulfillment of the requirements for the degree of Bachelor of Business Administration, 2023.
| Главный автор: | Aziz, Ahmed |
|---|---|
| Другие авторы: | Hossain, Saif |
| Формат: | Internship report |
| Язык: | English |
| Опубликовано: |
Brac University
2024
|
| Предметы: | |
| Online-ссылка: | http://hdl.handle.net/10361/22241 |
Схожие документы
-
Industrial wastewater treatment in developing countries.
Опубликовано: (1985) -
Business model canvas of sewage treatment plant
по: Alam, Walid
Опубликовано: (2021) -
Characterizing the optical property of plasmonic nanomaterial and use them to develop a tool for wastewater treatment
по: Islam, Md. Faqrul, и др.
Опубликовано: (2020) -
Isolation, characterization, identification and antimicrobial susceptibility testing of bacteria associated with pharmaceutical waste water treatment
по: Sharfin, Shah
Опубликовано: (2018) -
Municipal wastewater treatment in Central and Eastern Europe : present situation and cost-effective development strategies /
по: Somlyódy, L. (László)
Опубликовано: (1998)