Time-To-Build and Convex Adjustment Costs /
This paper incorporates time-to-build into the standard investment model with convex adjustment costs. The empirical Euler equation is estimated using a U.S. firm-level panel from Compustat. In spite of the introduction of time-to-build, the magnitude of the implied adjustment costs is unrealistical...
| Main Author: | |
|---|---|
| Format: | Journal |
| Language: | English |
| Published: |
Washington, D.C. :
International Monetary Fund,
2001.
|
| Series: | IMF Working Papers; Working Paper ;
No. 2001/009 |
| Online Access: | Full text available on IMF |
| Summary: | This paper incorporates time-to-build into the standard investment model with convex adjustment costs. The empirical Euler equation is estimated using a U.S. firm-level panel from Compustat. In spite of the introduction of time-to-build, the magnitude of the implied adjustment costs is unrealistically high. Exploiting another approach, I test directly the restrictions imposed by time-to-build on the investment equation. The results indicate that these restrictions cannot be rejected for five of the sixteen industries in the sample. Finally I show that time-to-build can explain approximately one-third of the variation in persistence of structure investment across four-digit industries. |
|---|---|
| Item Description: | <strong>Off-Campus Access:</strong> No User ID or Password Required <strong>On-Campus Access:</strong> No User ID or Password Required |
| Physical Description: | 1 online resource (23 pages) |
| Format: | Mode of access: Internet |
| ISSN: | 1018-5941 |
| Access: | Electronic access restricted to authorized BRAC University faculty, staff and students |