Time-To-Build and Convex Adjustment Costs /
This paper incorporates time-to-build into the standard investment model with convex adjustment costs. The empirical Euler equation is estimated using a U.S. firm-level panel from Compustat. In spite of the introduction of time-to-build, the magnitude of the implied adjustment costs is unrealistical...
| 第一著者: | Koeva Brooks, Petya |
|---|---|
| フォーマット: | 雑誌 |
| 言語: | English |
| 出版事項: |
Washington, D.C. :
International Monetary Fund,
2001.
|
| シリーズ: | IMF Working Papers; Working Paper ;
No. 2001/009 |
| オンライン・アクセス: | Full text available on IMF |
類似資料
-
The Facts About Time : To-Build /
著者:: Koeva Brooks, Petya
出版事項: (2000) -
Convex optimization /
著者:: Boyd, Stephen P.
出版事項: (1994) -
Convex optimization /
著者:: Boyd, Stephen P.
出版事項: (2004) -
Geodesic Convexity in Graphs
著者:: Pelayo
出版事項: (2013) -
Real and Convex Analysis
著者:: Çınlar
出版事項: (2013)