Transitional linkage: redesigning airport railway station with integrated MRT and BRT station

This thesis is submitted in partial fulfillment of the requirements for the degree of Bachelor of Architecture, 2017.

Detalles Bibliográficos
Autor principal: Rahman, Mohammad Zillur
Otros Autores: Department of Architecture, BRAC University
Formato: Tesis
Lenguaje:English
Publicado: BRAC Univeristy 2018
Materias:
Acceso en línea:http://hdl.handle.net/10361/10392