Transitional linkage: redesigning airport railway station with integrated MRT and BRT station

This thesis is submitted in partial fulfillment of the requirements for the degree of Bachelor of Architecture, 2017.

Sonraí bibleagrafaíochta
Príomhchruthaitheoir: Rahman, Mohammad Zillur
Rannpháirtithe: Department of Architecture, BRAC University
Formáid: Tráchtas
Teanga:English
Foilsithe / Cruthaithe: BRAC Univeristy 2018
Ábhair:
Rochtain ar líne:http://hdl.handle.net/10361/10392