Update regarding power connection for temporary 1000 KW load
This record consists of general correspondence regarding update of power connection for temporary 1000 KW load for BRAC University new campus project.
| Hovedforfatter: | Brac University |
|---|---|
| Format: | General correspondence |
| Sprog: | English |
| Udgivet: |
Brac University
2023
|
| Fag: | |
| Online adgang: | http://hdl.handle.net/10361/19664 |
Lignende værker
-
Connectivity of generation for BRAC University new campus project
af: Brac University
Udgivet: (2023) -
Valuation of rebar connection via mechanical coupler
af: Brac University
Udgivet: (2023) -
Valuation of rebar connection via mechanical coupler
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Regarding use of rebar for temporary work at BRAC University new campus project
af: Brac University
Udgivet: (2023) -
Regarding the temporary substation (internal substation) of the project
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)