Update regarding power connection for temporary 1000 KW load
This record consists of general correspondence regarding update of power connection for temporary 1000 KW load for BRAC University new campus project.
| Prif Awdur: | Brac University |
|---|---|
| Fformat: | General correspondence |
| Iaith: | English |
| Cyhoeddwyd: |
Brac University
2023
|
| Pynciau: | |
| Mynediad Ar-lein: | http://hdl.handle.net/10361/19664 |
Eitemau Tebyg
-
Connectivity of generation for BRAC University new campus project
gan: Brac University
Cyhoeddwyd: (2023) -
Valuation of rebar connection via mechanical coupler
gan: Brac University
Cyhoeddwyd: (2023) -
Valuation of rebar connection via mechanical coupler
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Regarding use of rebar for temporary work at BRAC University new campus project
gan: Brac University
Cyhoeddwyd: (2023) -
Regarding the temporary substation (internal substation) of the project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)