Revised IFC drawings impact to the construction period
This record consists of general correspondence regarding the revised IFC drawings impact to the construction period of BRACU new campus project site.
| Autor principal: | Brac University |
|---|---|
| Formato: | General correspondence |
| Lenguaje: | English |
| Publicado: |
Brac University
2023
|
| Materias: | |
| Acceso en línea: | http://hdl.handle.net/10361/19756 |
Ejemplares similares
-
The status of MEP IFC drawing
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
IFC drawing queries
por: Brac University
Publicado: (2023) -
Work interface of high voltage electrical and IFC drawing
por: Brac University
Publicado: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023)