Revised IFC drawings impact to the construction period
This record consists of general correspondence regarding the revised IFC drawings impact to the construction period of BRACU new campus project site.
| Main Author: | Brac University |
|---|---|
| Format: | General correspondence |
| Language: | English |
| Published: |
Brac University
2023
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/10361/19756 |
Similar Items
-
The status of MEP IFC drawing
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
IFC drawing queries
by: Brac University
Published: (2023) -
Work interface of high voltage electrical and IFC drawing
by: Brac University
Published: (2023) -
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023)