Construction of strengthening wall attached to diaphragm wall
This record consists of general correspondence regarding the construction of strengthening wall attached to diaphragm wall of BRACU new campus project site.
| 主要作者: | Brac University |
|---|---|
| 格式: | General correspondence |
| 语言: | English |
| 出版: |
Brac University
2023
|
| 主题: | |
| 在线阅读: | http://hdl.handle.net/10361/20087 |
相似书籍
-
Quotation for the additional wall attached to the diaphragm wall
由: Brac University
出版: (2023) -
Approval of unit rates of additional wall attached to D-Wall
由: Brac University
出版: (2023) -
Clarification on quotation for additional wall attached to the D-wall
出版: (2023) -
Additional wall attached to diaphragm wall
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Further clarification on quotation for additional wall attached to the D-Wal
由: Brac University
出版: (2023)