VO#033 Extra works for water treatment plant system rev.0
This record consists of general correspondence regarding the submission of proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
| 主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| 格式: | General correspondence |
| 语言: | English |
| 出版: |
Brac University
2023
|
| 主题: | |
| 在线阅读: | http://hdl.handle.net/10361/20123 |
相似书籍
Details of AT1,AT2 water fountain (RFA-525_Rev.B)
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023)
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023)
相似书籍
-
VO#033 Proposal of extra works for water treatment plant system rev.01
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
由: Brac University
出版: (2023) -
Proposal for changing the item of work for water treatment plant system
由: BUCG-ABC Joint Venture
出版: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
由: Ara, Roushon
出版: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
由: Aziz, Ahmed
出版: (2024)