Re-submit the evaluation for additional work of waterproofing
This record consists of general correspondence regarding re-submit the evaluation for additional work of waterproofing of BRACU new campus development project.
| Egile nagusia: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Formatua: | General correspondence |
| Hizkuntza: | English |
| Argitaratua: |
Brac University
2023
|
| Gaiak: | |
| Sarrera elektronikoa: | http://hdl.handle.net/10361/20375 |
Antzeko izenburuak
-
The calculation of additional excavation for waterproofing
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2023) -
Re: Instruction on the type of waterproofing treatment to be done in different location
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2023) -
Pre-qualification documents for waterproofing subcontractor
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2023)