Re: Completing all the M&E design immediately to be reviewed by Transsolar
This record consists of general correspondence regarding the completion of M&E design immediately to be reviewed by Transsolar for BRACU new campus project.
| Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Formato: | General correspondence |
| Lenguaje: | English |
| Publicado: |
Brac University
2023
|
| Materias: | |
| Acceso en línea: | http://hdl.handle.net/10361/20390 |
Ejemplares similares
-
Re: All the M&E design immediately to be reviewed by the Transsolar
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Completing all the M & E design immediately to be reviewed by TRANSSOLAR
por: Brac University
Publicado: (2023) -
Completing all the M&E design immediately to be reviewed by Transsolar
por: Brac University
Publicado: (2023) -
Re: Reminder of submitting the coordinated drawing on M&E design
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023)