Driving pre-cast piles for construction of BRAC University new campus project
This record consists of general correspondence regarding driving of pre-cast piles for construction of BRAC University new campus project.
| Autor Principal: | Century Realty Limited |
|---|---|
| Formato: | General correspondence |
| Idioma: | English |
| Publicado: |
Brac University
2023
|
| Subjects: | |
| Acceso en liña: | http://hdl.handle.net/10361/20560 |
Títulos similares
-
Observation during pre-cast pile
por: Brac University
Publicado: (2023) -
Seeking permission to dismantle north-east side boundary wall of century center to drive pre-cast piles
por: BUCG-ABC Joint Venture
Publicado: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Permission for dismantling north-east side boundary wall of century center to drive pre-cast piles
por: Brac University
Publicado: (2023) -
Regarding borrowing rebars for piling works of BRAC University new campus project
por: Brac University
Publicado: (2023)