Driving pre-cast piles for construction of BRAC University new campus project
This record consists of general correspondence regarding driving of pre-cast piles for construction of BRAC University new campus project.
| Main Author: | Century Realty Limited |
|---|---|
| Format: | General correspondence |
| Language: | English |
| Published: |
Brac University
2023
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/10361/20560 |
Similar Items
-
Observation during pre-cast pile
by: Brac University
Published: (2023) -
Seeking permission to dismantle north-east side boundary wall of century center to drive pre-cast piles
by: BUCG-ABC Joint Venture
Published: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Permission for dismantling north-east side boundary wall of century center to drive pre-cast piles
by: Brac University
Published: (2023) -
Regarding borrowing rebars for piling works of BRAC University new campus project
by: Brac University
Published: (2023)