Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
| 1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Format: | General correspondence |
| Sprache: | English |
| Veröffentlicht: |
Brac University
2023
|
| Schlagworte: | |
| Online Zugang: | http://hdl.handle.net/10361/20685 |
Ähnliche Einträge
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
The status of MEP IFC drawing
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Revised IFC drawings impact to the construction period
von: Brac University
Veröffentlicht: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2024) -
IFC drawing queries
von: Brac University
Veröffentlicht: (2023)