Regarding the deviation in the groove making & pit width at north zone escalator of BRAC University new campus project
This record consists of general correspondence regarding the deviation in the groove making & pit width at north zone escalator of BRAC University new campus project.
| Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Format: | General correspondence |
| Language: | English |
| Published: |
Brac University
2023
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/10361/20705 |
Similar Items
-
Regarding the deviation in the groove making & pit width at north zone escalator
by: Brac University
Published: (2023) -
Work order for groove cutting of Brac University new campus project
by: Brac University
Published: (2023) -
Work order for groove cutting, finishing, dismantling lab floor tiles, re-plastering or install for Brac University new campus project
by: Brac University
Published: (2023) -
Drip groove on 4F roof (RFA-502_Rev A)
by: WOHA Designs PTE LTD, et al.
Published: (2023) -
Confirmation to manufacture north zone escalator from B1 to Level 10
by: Brac University
Published: (2023)