Glass specification & physical sample for CW1-6, SF1-5, SF6-10B, SF13-15 & SF11-12 (RFA-02_Rev B)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
| Main Author: | Arman Engineering Ltd. |
|---|---|
| Format: | Drawings |
| Language: | English |
| Published: |
Brac University
2023
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/10361/20943 |
Similar Items
-
Aluminum color physical sample for CW1-6, SF1-5, SF6-10B, SF13-15 & SF11-12 (RFA - 03_Rev A)
by: Arman Engineering Ltd.
Published: (2023) -
Glass specification & physical sample for spandrel glass CW1-6 (RFA-02_Rev C)
by: Arman Engineering Ltd.
Published: (2023) -
Shop drawing of hidden framing glass curtain wall (aluminum clad steel) of section 3 (SF01-SF05) (RFA-010_Rev D)
by: Arman Engineering Ltd.
Published: (2023) -
Shop drawing of SF11-SF12 (RFA-015_Rev B)
by: Arman Engineering Ltd.
Published: (2023) -
Structural calculation report for curtain wall SF01-SF05 (RFA-009_Rev A)
by: Arman Engineering Ltd.
Published: (2023)