Waterproofing for retaining wall
This variation order has been made between Brac University and BUCG-ABC Joint Venture fo waterproofing for retaining wall of dismantling of guide wall of Brac University new campus project.
| Autor principal: | BUCG-ABC Joint Venture |
|---|---|
| Format: | Variation order |
| Idioma: | English |
| Publicat: |
Brac University
2023
|
| Matèries: | |
| Accés en línia: | http://hdl.handle.net/10361/21031 |
Ítems similars
-
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
per: BUCG-ABC Joint Venture
Publicat: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
per: BUCG-ABC Joint Venture
Publicat: (2023) -
Additional wall attached to diaphragm wall
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
D-wall remedial work
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023)