CC3 & CC5 demarcation layout of B1-12F (RFA-516_Rev.D)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of PDF version of drawings.
| 1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Format: | Drawings |
| Sprache: | English |
| Veröffentlicht: |
Brac University
2023
|
| Schlagworte: | |
| Online Zugang: | http://hdl.handle.net/10361/21175 |
Ähnliche Einträge
-
Architectural - CC5 setting out for exterior wall (RFA-224_Rev A)
von: WOHA Designs PTE LTD, et al.
Veröffentlicht: (2023) -
CC3 & CC5 demarcation layout of roof storey (RFA-413_Rev B)
von: WOHA Designs PTE LTD, et al.
Veröffentlicht: (2023) -
Architectural shop drawing of CC3 & CC5 demarcation layout of roof storey (RFA-413_Rev B)
von: BUCG-ABC Joint Venture
Veröffentlicht: (2023) -
CM7 detail update and CC7 in MPH (RFA-521_Rev.D)
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Basement finishes demarcation (RFA-407_Rev D)
von: WOHA Designs PTE LTD, et al.
Veröffentlicht: (2023)