STP & WTP - foundation of plant in basement-2 of BRAC University new campus project
This record contains as-built drawing of RCC (Reinforced Cement Concrete) structure of Brac University New Campus Project. It consists of both PDF and DWG version of drawings.
| Κύριος συγγραφέας: | WEB Structures |
|---|---|
| Μορφή: | Drawings |
| Γλώσσα: | English |
| Έκδοση: |
Brac University
2023
|
| Θέματα: | |
| Διαθέσιμο Online: | http://hdl.handle.net/10361/21625 |
Παρόμοια τεκμήρια
-
STP & WTP beam slab wall column of BRAC University new campus project
ανά: WEB Structures
Έκδοση: (2023) -
WTP & STP drawing of BRAC University New Campus for RAJUK
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2024) -
B3-B1 wall & column of BRAC University new campus project
ανά: WEB Structures
Έκδοση: (2023) -
STP & water tank layout for basement 3 (utility building)
ανά: Electro-Mechanical Control Services (EMCS)
Έκδοση: (2023) -
STP section=2-2 of BRAC University new campus project
ανά: Electro-Mechanical Control Services (EMCS)
Έκδοση: (2023)