Operation of substation design and quality control of Power Grid Company of Bangladesh Limited
This internship report is submitted in a partial fulfillment of the requirements for the degree of Master of Business Administration, 2016.
| Autore principale: | Rashid, Humayun |
|---|---|
| Altri autori: | Arifuzzaman, S. M |
| Natura: | Internship report |
| Lingua: | English |
| Pubblicazione: |
BRAC University
2016
|
| Soggetti: | |
| Accesso online: | http://hdl.handle.net/10361/6150 |
Documenti analoghi
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Regarding the temporary substation (internal substation) of the project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Prospects and challenges of outsourcing in the context of power grid company of Bangladesh limited
di: Shihab, Mohammad Abdullah
Pubblicazione: (2018) -
Documents for temporary substation
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Instruction to start the work of substation at BRACU new campus project
di: Brac University
Pubblicazione: (2023)